Click to place · R rotate · Z undo · Space release valve · Esc pause
How to Play
The queue is law.
The next five fittings are locked in. Place the top piece on the grid.
Rotate it with R or right-click if your plant allows it.
The valve will open.
After the countdown, luminous flooz floods from the intake. You may still
lay pipe ahead of the flow — that is the whole job.
Distance is the contract.
Survive the minimum run. Extra length is bonus. Unused fittings on the
floor are a fine. Replacing a dry pipe costs 50.
Junctions have two lives.
A cross carries independent axes. Thread both for a Double Cross bonus.
Reservoirs stall the surge. One-ways do not reverse.
Some sectors wrap. Some have a drain.
If there is a pink sink, you must reach it — and still meet distance.
Open the valve early with Space for leftover-time points.