⬡
FLOOZ
PIPE SYSTEMS · 2091
1
0
0/12
—
BRIEFING
- A reservoir will dump flooz into the start fitting after a countdown.
- Place fittings from the queue to build a continuous conduit.
- Reach the required distance (and the exit, when present) before the flooz finds an open end.
- Crosses and junctions can be reused — plan loops for bonus score.
- Click a placed, still-dry fitting to replace it (costs 50). Bombs appear later.
LEADERBOARD